Получите консультацию специалиста
Заполните форму и наш специалист свяжется с Вами
Отримайте консультацію фахівця
Заповніть форму і наш фахівець зв'яжеться з Вами
Get specialist advice
Fill out the form and our specialist will contact you
GAS CONCRETE HOUSES
Order a calculation

GROUND SCREW FOUNDATION FOR GAS CONCRETE HOUSE

Houses made of gas concrete have lots of advantages:

  • it is relatively light weight;
  • it retains heat from the sun's rays and radiators well;
  • it has excellent sound insulation, high resistance to temperature and high durability;
  • it can be made in different forms.
When choosing a foundation for a house of gas concrete you have to keep in mind that the foundation for such houses should retain the shape of the house that was originally set in the project.

The most suitable foundation for gas block houses is the foundation on ground screws.

The ground screws for houses made from the gas concrete are easy to install. The screw foundation for gas concrete houses is the most matching option for building such houses on heaving soils and steep slopes, because such a foundation does not require complex excavation and concrete work, protection the concrete against water, leveling the site. All this greatly simplifies the installing of a foundation.

PILLAR compiles a project for the foundation of a gas concrete house, prepares drawings of the foundation for these houses and calculates the foundation for such a house. Our services also include design the foundation for a gas concrete house.

Our company offers developing design and installation services of pile foundations for gas concrete houses in Kyiv, Kharkiv, Dnipro, Odesa, Mykolaiv, Lviv, Zaporizhzhia and other cities of Ukraine.

ADVANTAGES OF THE GAS CONCRETE HOUSE FOUNDATION ON GROUND SCREWS

Installation of the foundation in 48 hours
One ground screw is installed in up to 15 minutes. You can start the construction of the building immediately after finishing with ground screws. Foundation of the house on the ground screws does not require shrinkage, because after screwing up the soil is compacted and as a result the soil is capable of supporting the weight of the house.
Easy installation
It is possible to install the foundation within several days. Involvement of complex construction equipment and excavation as concrete works are not required.
Solving relief problems
The possibility of mounting on sites with a complex landscape or on a slope, where the concrete foundation requires enormous labor and financial costs.
No water impact
Galvanized piles are practically not corroded, which allows its use in water-saturated soils and even in reservoirs.
No garbage at the construction site
Installation of the ground screw foundation is carried out using a mode, in which there remains a minimum of construction waste at the end of the work.
The possibility of installation in cold season
Compared to strip foundations, the pouring of it in winter time requires additional costs bound on thermal insulation of concrete. The installation of ground screws can be done in the normal operating mode.
DO YOU HAVE QUESTIONS?
Leave your contact details and we will call you back

STAGES OF INSTALLATION OF THE GROUND SCREW FOUNDATION FOR GAS CONCRETE HOUSE

Geological survey and construction project
In order to get optimal solution for the construction of the foundation the customer must provide a geological survey of the site and provide a construction project. Considering these data experts make conclusions about the properties of the soil and the loads of the future construction.
Design
Based on the data obtained our engineers prepare a calculation of the required number of screws and the distance between them, as well as the depth of it's immersion. Depending on the collected loads for the foundation of the house, the optimal diameter and required length for ground screws are selected.
Installation
Screw foundations for low-rise buildings are installed in a short time. Depending on the complexity of the object, there are three options for screwing in: manual, electromechanical and hydraulic. After the ground screws have been installed at the required in design depth, the headstrap is strapped.

GROUND SCREWS FOR GAS CONCRETE HOUSE

Pillar is your partner for ground screw foundations.

Contacting Pillar you get:

  • The ability to order a key-ready foundation. We will do all the work on time in the best quality.
  • Fast individual foundation calculation from experienced engineers.
  • Fast installation and efficiency of the performed works in Kyiv, Dnipro, Kharkiv, Odesa, Zaporizhzhia, and other cities of Ukraine.
  • Free delivery to any city in Ukraine.
  • Technical support and assistance of specialists in foundation construction.
The company has its own production of galvanized piles, which can be bought at reasonable prices in Ukraine. We are able to provide qualified professionals who make the design and calculation of costs for the foundation, as well as help in registering of the necessary documents. Just fill in the form for a callback or call our consultant to make the installation of a pile foundation.