INDUSTRIAL SOLAR POWER PLANTS

Order station calculation

CONSTRUCTION OF INDUSTRIAL SOLAR POWER PLANTS

Pillar designs, manufactures and installs metal racks for industrial solar stations and additional facilities.
We can provide you with typical solutions for tables for solar panels. These tables are designed specifically for the climatic conditions of Ukraine and provide optimal energy generation. We can also design and produce tables for your individual tasks. We select the best option for the foundation, depending on the conditions on the site, so it can be: a screw foundation on ground-screws, racks for concreting and driven piles.

We can put on the construction site and install additional structures to ensure the safety and ease of operation of the solar station: fences for your solar station, foundations for residential complexes, guard houses and transformer substations. As well as lighting poles and flagpoles.
Member of the Association of Solar Energy of Ukraine
CONSTRUCTION OF SOLAR
POWER PLANTS IN THE COMPLEX
PRODUCTION, DELIVERY AND INSTALLATION RACKS FOR SOLAR POWER PLANTS
FENCING FOR SOLAR POWER PLANTS
FOUNDATIONS FOR HOUSEHOLD COMPLEXES
FOUNDATIONS FOR TRANSFORMER SUBSTATIONS
LIGHTNING POLE FOR SOLAR POWER PLANTS
FLAGPOLE FOR SOLAR POWER PLANTS

INDUSTRIAL SOLAR POWER PLANTS THAT WE BUILT

Including: design, manufacture, supply and installation of racks for solar power plants
5.7 MW reg. Dnepropetrovsk, Chumaki
SOLAR STATION 5,7 MW IN THE VILLAGE OF CHUMAKY
Object location: s. Chumaky
Construction time: February 2019

Completed work:
  • Design
  • Production
  • Installation

Solved problems:
  • installation in a limited time;
  • delivery of exclusive racks on ground screws

Places for panels: 17 288 pcs
Number of ground screws: 4 804 pcs
4.3 MW reg. Kharkov, Merefa
SOLAR STATION 4,3 MW IN KHARKOV REGION
Location of the object: Merefa
Construction time: October 2018

Completed work:
  • Design
  • Production
  • Installation

Solved problems:
  • installation in a limited time;
  • ease of installation.

Places for panels: 13 680 pcs
Number of ground screws: 5 040 pcs
4.68 MW reg. Kherson, Pidstepne
SOLAR STATION 4,68 MW IN THE KHERSON REGION
Location of the object: Pidstepne
Construction time: November 2018

Completed work:
  • Design
  • Production
  • Installation

Solved problems:
  • installation in a limited time;
  • ease of installation.

Places for panels: 13 392 pcs
Number of ground screws: 8 164 pcs
3.5 MW reg. Zakarpattia, Chop
SOLAR STATION 3.5 MW IN ZAKARPATTIA REGION
Location of the object: Chop
Construction time: October 2018

Completed work:
  • Production

Solved problems:
  • installation in a limited time;
  • ease of installation.

Places for panels: 12 988 pcs
Number of ground screws: 3 540 pcs
7 MW reg. Vinnytsia, Plyskov
7 MW SOLAR STATION IN VINNYTSIA REGION
Object location: s. Plyskov
Construction time: December 2018

Completed work:
  • Design
  • Productions

Solved tasks:

  • installation in a limited time;
  • ease of installation.

Places for panel: 25 744pcs.
Number of ground screws: 6,436 pcs.
5.54 MW reg. Dnepropetrovsk, Novopetrovka
SUN STATION 5.54 MW IN DNIPROPETROVSK REGION
Object location: s. Novopetrovka
Build Time: August 2019

Completed work:
  • Design
  • Production
  • Mounting

Solved tasks:

  • limited installation time

Places for panel: 19,818 pcs.
Number of ground screws: 8 164 pcs.
2.5 MW reg. Kirovograd, Kamyshevatoe
2.5 MW SOLAR STATION IN THE KIROVOGRAD REGION
Object location: s. Kamyshevatoe
Construction time: September 2019

Completed work:
  • Design
  • Production
  • Mounting

Solved tasks:

  • limited installation time.

Places under the panel: 9 600 pcs.
Number of geo-screws: 2,880 pcs.
0.75 MW reg. Ternopol, Zaliztsy
SOLAR STATION 0.75 MW IN TERNOPIL REGION
Object location: Zaliztsy
Build Time: June 2019

Completed work:
  • Design
  • Production

Solved tasks:

  • ease of installation;

Places under the panel: 2 640 pcs.
1.5 MW reg. Lviv, Lviv
1.5 MW PARKING IN THE LVIV REGION
Location: Lviv
Construction time: September 2019

Completed work:
  • Design
  • Production
  • Mounting

Solved tasks:

  • installation in a limited time;
  • canopy design.

Places under the panel: 3981 pcs.
Number of parking spaces: 514 pcs.
13.5 MW reg. Dnepropetrovsk, Tsibulkovka
SOLAR POWER PLANT 13.5 MW IN DNIPROPETROVSK REGION
Object location: Tsibulkovka
Construction time: September 2019

Completed work:
  • Design
  • Production
  • Mounting
Solved tasks:
  • Limited installation time

Places under the panel: 36,000 pcs.
Number of ground screws: 10,000 pcs.
12 MW reg. Kiev, Ozerna
12 MW SOLAR POWER PLANT IN KIEV REGION
Object location: s. Ozerna
Construction time: September 2019

Completed work:

  • Design
  • Production
  • Mounting
Solved tasks:
  • Limited installation time
Places under the panel: 36,828 pcs.
Number of ground screws: 10 230 pcs.
SOLAR STATION 5,7 MW IN THE VILLAGE OF CHUMAKY
Object location: s. Chumaky
Construction time: February 2019

Completed work:
  • Design
  • Production
  • Installation
Solved problems:
  • installation in a limited time;
  • delivery of exclusive racks on ground screws
Places for panels: 17 288 pcs
Number of ground screws: 4 804 pcs
SOLAR STATION 4,3 MW IN KHARKOV REGION
Location of the object: Merefa
Construction time: October 2018

Completed work:
  • Design
  • Production
  • Installation
Solved problems:
  • installation in a limited time;
  • ease of installation.
Places for panels: 13 680 pcs
Number of ground screws: 5 040 pcs
SOLAR STATION 4,68 MW IN THE KHERSON REGION
Location of the object: Pidstepne
Construction time: November 2018

Completed work:
  • Design
  • Production
  • Installation
Solved problems:
  • installation in a limited time;
  • ease of installation.
Places for panels: 13 392 pcs
Number of ground screws: 8 164 pcs
SUN STATION 5.54 MW IN DNIPROPETROVSK REGION
Object location: s. Novopetrovka
Build Time: August 2019

Completed work:
  • Design
  • Production
  • Mounting
Solved tasks:
  • limited installation time
Places for panel: 19,818 pcs.
Number of ground screws: 8 164 pcs.
2.5 MW SOLAR STATION IN THE KIROVOGRAD REGION
Object location: s. Kamyshevatoe
Construction time: September 2019

Completed work:
  • Design
  • Production
  • Mounting
Solved tasks:
  • limited installation time.
Places under the panel: 9 600 pcs.
Number of geo-screws: 2,880 pcs.
SOLAR STATION 3.5 MW IN ZAKARPATTIA REGION
Location of the object: Chop
Construction time: October 2018

Completed work:
  • Production
Solved problems:
  • installation in a limited time;
  • ease of installation.
Places for panels: 12 988 pcs
Number of ground screws: 3 540 pcs
7 MW SOLAR STATION IN VINNYTSIA REGION
Object location: s. Plyskov
Construction time: December 2018

Completed work:
  • Design
  • Productions
Solved tasks:
  • installation in a limited time;
  • ease of installation.
Places for panel: 25 744pcs.
Number of ground screws: 6,436 pcs.
1.5 MW PARKING IN THE LVIV REGION
Location: Lviv
Construction time: September 2019

Completed work:
  • Design
  • Production
  • Mounting
Solved tasks:
  • installation in a limited time;
  • canopy design.
Places under the panel: 3981 pcs.
Number of parking spaces: 514 pcs.
SOLAR STATION 0.75 MW IN TERNOPIL REGION
Object location: Zaliztsy
Build Time: June 2019

Completed work:
  • Design
  • Production
Solved tasks:
  • ease of installation;
Places under the panel: 2 640 pcs.
12 MW SOLAR POWER PLANT IN KIEV REGION
Object location: Ozerna
Construction time: September 2019

Completed work:

  • Design
  • Production
  • Mounting
Solved tasks:
  • Limited installation time
Places under the panel: 36,828 pcs.
Number of ground screws: 10 230 pcs.
SOLAR POWER PLANT 13.5 MW IN DNIPROPETROVSK REGION
Object location: Tsibulkovka
Construction time: September 2019

Completed work:
  • Design
  • Production
  • Mounting
Solved tasks:
  • Limited installation time
Places under the panel: 36,000 pcs.
Number of ground screws: 10,000 pcs.

EVERYTHING FOR INDUSTRIAL SOLAR POWER PLANTS

Racks for solar plover plants
We can provide you with metal structures for industrial solar power plants, both terrestrial and roof types.
We have standard solutions designed specifically for the optimal generation of solar energy in the climatic conditions of Ukraine. We can also develop and produce metal structures for your individual tasks.
We select the best foundation for the conditions on the construction site, so it can be: a screw foundation on ground screus, concrete stands and driven piles.
Fencing for solar plover plants
We can build fences to ensure the safety of your solar power plant. Fence racks are specially designed for the flange of our ground screws. This simplifies installation and increases installation speed. So in a few days we can fence the entire station.
Foundation for household complexes
We specialize in the construction of prefabricated foundations on ground screws. Such a foundation is mounted in 1 day. Then on it you can immediately install a modular house for staff working at the station.
Foundation for transformer substations
The screw foundation on the geo-screws is excellent for installing transformer substations such as СTS (complex transformer substation) and CDSC (Complete distribution substation of closed type).
The screw foundation is mounted in 1 day. A transformer substation can be installed immediately after the construction of the station
Lighting pillars for solar plover plants
We provide lighting poles for our own solar power plants.
This type of support is well considered with a screw foundation. thanks to which they can be installed in a short time. One support is assembled in only about 1 hour.
It is possible to place fixtures for the solar panel to support autonomous lighting.
Flagpoles for solar plover plants
We provide lighting poles for our own solar power plants.
This type of support is well considered with a screw foundation. thanks to which they can be installed in a short time. One support is assembled in only about 1 hour.
It is possible to place fixtures for the solar panel to support autonomous lighting.

STAGES OF INSTALLING A SOLAR POWER PLANT

Ordering
To start the calculation from the customer, we need to obtain the following data: the desired power of the station, the size and thickness of the panels, the number of tables and rows, as well as the orientation of the panels, their angle of inclination and rise above the ground. For the construction of large facilities, geological survey data will also be required.
Design
In order to correctly place tables for solar stations on the plots, it is necessary to carry out competent design work. It takes into account the size and weight of the structure, its area, soil geology, wind and snow loads. The result of the calculations is the determination of the optimal size of ground-screws and uniform distribution of the load on the structure.
Installation
Installation of structures begins immediately after the first delivery to the facility. Complex terrain or bad weather conditions are not obstacles for the installation of a screw base for solar panels. First, marking of the pile field is carried out, ground-screws are mounted, then a frame for solar panels is installed and the panels themselves are installed. We can also mount additional facilities.
DO YOU HAVE QUESTIONS?
Leave your contact details and we will call you back

RACKS FOR SOLAR PANELS

Pillar is your partner in building industrial solar stations.

Our advantages are:
  • own production of ground screws and racks for solar panels;
  • many years of experience;
  • staff of qualified design engineers;
  • continuous product development;
  • affordable price for geoshowels and metal structures;
  • acceptance of applications from all over Ukraine: Kiev, Kharkov, Dnipro and other cities.
To get a free consultation or to clarify the cost of structures and screw foundations for your turnkey solar system, call us on the hotline. You can also order a callback on the site in just three clicks, after which the Pillar consultants will call you back and answer all your questions.